Choose From 3 Programs
To Maximize Your Profits
3 Programs To Manage Your DigiTint & DigiShield Products


|

|

|
A computer controlled inventory and tracking program managing pre-cut and preshrunk kits for the installation of automotive overlay protection films.
-
9 installs of window film per day on average
-
Largest ability to Produce
-
Ready-To-Hang
-
NO cutting system
-
Most Profitable
-
Minimal Training
-
Low Skill Req.
-
Advanced Tracking & Reporting
|
The combination of our computer controlled tracking program, our cutting system and precut and preshrunk back glasses.
-
7 installs of window film per day on average
-
Ready-To-Hang plus
-
Cutting System
-
On-Demand Cutting
-
Advanced Training
-
Advanced Skill Level
-
Advanced Tracking & Reporting
|
A computer controlled system allowing our partners the ability to produce onsite and track all films down to the hundredth of a square foot and obtain detailed reports.
-
5 installs of window film per day on average
-
Cutting system
-
Over 100,000 Templates
-
All films cut onsite
-
Advanced training
-
High skill level req.
-
Advanced Tracking & Reporting
|
 |

|

|
|